Water Management Plan : stage two
Penrith Lakes Development Corporation Limited
Books, Manuscripts
Find it!
The delivery of the Water Management Plan has been completed over 2 stages at the request of the Depeartment of Planning, Industry and Environment (DPIE). This document presents the final stage of the Water Management Plan combining work completed in 2014 (original Stage 2 submission) and the outcomes of the "In-Principle Agreement" between PLDC and DPIE agreed February 2019. The Stage 2 addresses water quality, groundwater, stormwater, ecosystem and fisheries management as well as southern wetlands design and lakes operations plan.
Water Management Plan : stage two / by Penrith Lakes Development Corporation Limited
Castlereagh NSW : Penrith Lakes Development Corporation Limited, May 2020
56 pages photographs, maps
references: page 56
Contents: Introduction - The Scheme - Groundwater management - Stormwater management - Ecosystem development - Fisheries management - Water quality model - Water quality model outcomes - Operational infrastructure - Lakes operations plan - Conclusion and recommendations.
627.046
English
403193
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Local Book | 627.046 WAT | Not for loan (Set: 14 Feb 2022) |