Stormwater drainage of early release areas report section 3 : stormwater drainage Peach Tree Creek
Gutteridge, Haskins & DaveyUUUU
Books, Manuscripts
Find it!
Report on the investigation of the levels of stormwater and flood water through Peach Tree Creek and its catchment into the Nepean River
Stormwater drainage of early release areas report section 3 : stormwater drainage Peach Tree Creek / by Gutteridge, Haskins and Davey for Penrith City Council
Sydney NSW Gutteridge
11 page report appendices maps
From Council file 4/18/1-E
Includes flow schedules, flow diagrams, detailed drainage maps
627.45 STO
627.45
English
Storm-water drainage basins (Engineering) -- Penrith Region (NSW)Storm-water drainage basins (Engineering) -- South Penrith (NSW) -- PlanningStorm-water drainage basins (Engineering) -- South Penrith (NSW) -- MapsFlood control -- Peach Tree Creek (Penrith, NSW) -- PlanningFlood-plain management -- Peach Tree Creek (Penrith, NSW)Storm-water drainage (Engineering) -- Peach Tree Creek (NSW)Storm-water drainage (Engineering) -- Penrith (NSW) -- Planning
97086
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Local Book | 627.45 STO | Not for loan (Set: 10 Feb 2016) |