Rouse Hill infrastructure project. Water, sewerage and trunk drainage : rezoning application report for lands on either side of Caddies Creek downstream of the Whitehart Bridge, Windsor Road. Volume 3: Appendix D, Appendix E. Lots 201, 19, 18 and 17
Rouse Hill Infrastructure Consortium Pty Limited2000
Books, Manuscripts
Find it!
The rezoning and associated landfill would proivde for development other than trunk drainage which is consistent with the current use of the land and future development in the locality.
Rouse Hill infrastructure project. Water, sewerage and trunk drainage : rezoning application report for lands on either side of Caddies Creek downstream of the Whitehart Bridge, Windsor Road. Volume 3: Appendix D, Appendix E. Lots 201, 19, 18 and 17 / by Rouse Hill Infrastructure Consortium Pty Limited
Rouse Hill Rouse Hill Infrastructure Consortium Pty Limited Jul 2000
various pgs colour illustrations maps
Consultation - Description of the proposal -- Location and setting - Landowners and land use - Existing planning controls and approvals - Description of proposal - Extent of landfilling - Environmental impacts and mitigation measures -- Land use and zoning - Assessment of impacts - Mitigation measures - Topography, Geology and soils - Drainage, flodding and wate quality - Acoustic environment - Air quality - Visual assessment - Flora and fauna - Aboriginal heritage - European heritage - Provision of services to the land - Land contamination - Cumulative impacts - Project alternatives and justification
363.7284 ROU
363.7284
English
124961
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Tech Book | 363.7284 ROU | Available |