Penrith CBD Floodplain Risk Management Study and Plan : final report
Molino Stewart Pty Ltd
Books, Manuscripts
Find it!
The overall purpose of this study and plan is to find practical, affordable and acceptable means to manage the impact of flooding on people, property and the environment. This FRMS&P deals with local catchment flooding only, although it acknowledges the implications of mainstream flooding from the Hawkesbury-Nepean River, particularly in terms of emergency management.
Penrith CBD Floodplain Risk Management Study and Plan : final report / prepared by Molino Stewart Pty Ltd
Parramatta : Molino Stewart Pty Ltd, March 2020
118 pages : illustrations, maps, photographs, figures, tables + appendices
Floodplain Risk Management Process -- Catchment Characteristics -- Heritage Values -- Social Profile -- Urban Planning Context -- NSW Environmental Planning and Assessment Act 1979 -- State Environmental Planning Policies (SEPP) -- Penrith LEP 2010 -- Penrith DCP 2014 -- Emergency Management Context -- Hawkesbury Nepean Flood Plan -- Penrith Local Flood Plan (2012) -- Community and Stakeholder Engagement -- Penrith CBD Detailed Overland Flow Flood Study (Cardno, 2015) -- Nepean River Flood Modelling -- Summary of Flood Behaviour -- Flood Risks -- Flood Risk Reduction Measures --Land Zoning -- Flood Levels -- Peak Flood Depth -- Flood Velocity -- Peak Flood Hazard -- Residential Flood Damages -- Hot Spot -- Summary of Flood Risk Mitigation Options.
627.4
English
386454
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Local Book | 627.4 PEN | Final Report Not for loan (Set: 23 Dec 2020) |
Research | Local Book | 627.4 PEN | Final Report - Volume 2 - MapsNot for loan (Set: 23 Dec 2020) |
Research | Tech Book | 627.4 PEN | Final Report Available |
Research | Tech Book | 627.4 PEN | Final Report - Volume 2 - MapsAvailable |