Skip to main content
Thumbnail for Stage 2 Hydrological report Flood Detention and Water Quality Proposed Re-zoning of Lot 2 DP 1057347 Corner of the Northern Road & Cranebrook Road, Cranebrook, NSW : Draft

Stage 2 Hydrological report Flood Detention and Water Quality Proposed Re-zoning of Lot 2 DP 1057347 Corner of the Northern Road & Cranebrook Road, Cranebrook, NSW : Draft

Fiander, H. J.2005
Books, Manuscripts
Based on a residential development of the site, this report investigates post-development water flow, models water quality, recommends flood detention strategies and methods to improve and protect water quality on the site and downstream.
Imprint:
Castle Hill NSW: Toby Fiander and Associates September 2005
Collation:
24 p.
Contents:
Hydrological modelling for flood mitigation - Hydraulic modelling: HEC-RAS - Water quality modelling
Dewey class:
711.4 711.4
Language:
English
BRN:
61737
LocationCollectionCall numberStatus/Desc
ResearchLocal Book711.4 CRANot for loan (Set: 18 Apr 2018)
View my active saved list
0 items in my active saved list