Stage 2 Hydrological report Flood Detention and Water Quality Proposed Re-zoning of Lot 2 DP 1057347 Corner of the Northern Road & Cranebrook Road, Cranebrook, NSW : Draft
Fiander, H. J.2005
Books, Manuscripts
Find it!
Based on a residential development of the site, this report investigates post-development water flow, models water quality, recommends flood detention strategies and methods to improve and protect water quality on the site and downstream.
Stage 2 Hydrological report Flood Detention and Water Quality Proposed Re-zoning of Lot 2 DP 1057347 Corner of the Northern Road & Cranebrook Road, Cranebrook, NSW : Draft / by H J (Toby) Fiander, P Brown, A Nash and M Winthorpe
Castle Hill NSW: Toby Fiander and Associates September 2005
24 p.
Hydrological modelling for flood mitigation - Hydraulic modelling: HEC-RAS - Water quality modelling
711.4 711.4
English
61737
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Local Book | 711.4 CRA | Not for loan (Set: 18 Apr 2018) |