St Marys project, eastern precinct : Precinct plan: Water, soils and infrastructure
Maryland Development Company Pty. LtdUUUU
Books, Manuscripts
Find it!
All elements of the investigation for the precinct plan for the eastern precinct relating to water cycle, groundwater, flooding, water and soils and infrastructure are contained in this report.
Main title:
St Marys project, eastern precinct : Precinct plan: Water, soils and infrastructure / by Patterson, Britton and Partners
Imprint:
Patterson Britton and Partners June 2003
Collation:
42 p. plus figures colour maps
Contents:
Existing conditions - Topography - Subsurface soil conditions - Groundwater - Salinity - Hydrology - Runoff quality - Flooding - Services infrastructure - Performance objectives - Proposed development - Water cycle management strategy - Groundwater management strategy - Soil and water management strategy - Flood evaluation strategy - Trunk drainage system (Appendices not included)
Dewey class:
711.58 ADI
Local class:
711.58
Language:
English
Subject:
Storm-water drainage basins (Engineering) -- St Marys (N.S.W.)Storm-water drainage (Engineering) -- St Marys (N.S.W.) -- ManagementStorm-water drainage (Engineering) -- St Marys (N.S.W.) -- PlanningRopes Creek Precinct (Former ADI, Australian Defence Industries Site, Blacktown, NSW) -- PlanningRopes Creek Precinct (Former ADI, Australian Defence Industries Site, Blacktown, NSW) -- Development Control StrategyUrban runoff -- New South Wales -- Environmental aspectsUrban runoff -- New South Wales -- ManagementHydrology (Water cycle) -- Ropes Creek (NSW)
BRN:
34920
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Tech Book | 711.58 ADI | Available |