Australian Defence Industries site [ADI] - St Marys : water cycle management study : part 1 water quality objectives
Sinclair Knight Merz Pty. Ltd1994
Books, Manuscripts
Find it!
This report are to address the issues relevant to South Creek and more specifically the ADI site and St Marys munitions facility development occurring in the western sector. Existing water supply and sewerage infrastructure is generally old and of limited
St Leonards NSW: Sinclair Knight Merz October 1994
17 p. maps plan
Existing site usage - St Marys STP - Sources of pollution - Water quality objectives for South Creek -- Direction of government water quality objectives - Interim water quality objectives - Stormwater management - Water minimisation - Sewerage - Measures offsite
711.58
English
Water qualityWater supplyFlood controlOpen spaces in storm-water drainage (Engineering)Water resources management -- South Creek (NSW)Storm-water drainage (Engineering) -- South Creek Valley (NSW) -- ManagementGround-waterADI (Australian Defence Industries) site -- St Marys (N.S.W.) -- Regional Environmental Plan
122901
Location | Collection | Call number | Status/Desc |
---|---|---|---|
Research | Local Book | 711.58 ADI | Not for loan (Set: 02 May 2018) |